Beta
N.Y. ENG
Energy Law
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Always check the official source for the current text.
§ 1-101 Short title
§ 1-101. Short title. This chapter shall be known and may be cited as
the "energy law."
§ 1-103 Definitions
§ 1-103. Definitions. As used in this chapter, unless a different
meaning clearly appears from the context or unless a different meaning
is stated in a definition applicable to only a portion of this chapter:
1. "Agency" shall mean any state department, agency, board, public
benefit corporation, public authority or commission.
2. "Office" as used in sections 5-108, 5-111, 5-113, and 5-117 of
article five and articles six, seven, eight and ten of this chapter
shall mean the New York state energy research and development authority
established pursuant to article eight of the public authorities law.
3. "Coal" shall include bituminuous coal, anthracite coal, and
lignite.
4. "Commissioner" as used in sections 5-108, 5-111, 5-113, and 5-117
of article five and articles six, seven, eight and ten of this chapter
shall mean the president of the New York state energy research and
development authority.
5. "Energy" means work or heat that is, or may be, produced from any
fuel or source whatsoever.
6. "Energy resources" shall mean any force or material which yields or
has the potential to yield energy, including but not limited to
electrical, fossil, geothermal, wind, hydro, solid waste, tidal, wood,
solar and nuclear sources.
7. "Fossil fuel" shall mean coal, petroleum products and fuel gases.
8. "Fuel gases" shall include but not be limited to methane, natural
gas, liquefied natural gas, and manufactured fuel gases.
9. "Municipality" or "municipal corporation" shall mean a city,
county, town, village, school district, special purpose district, or an
agency thereof.
10. "Person" shall mean any individual, trustee, agency, partnership,
association, corporation, company, municipality, political subdivision
or other legal entity.
11. "Petroleum products" shall include all products refined or
rerefined from synthetic or crude oil or oil extracted from other
sources, including natural gas liquids.
12. "Renewable energy resources" shall include sources which are
capable of being continuously restored by natural or other means or are
so large as to be useable for centuries without significant depletion
and include but are not limited to solar, wind, plant and forest
products, wastes, tidal, hydro, geothermal, deuterium, and hydrogen.
13. "Telecommuting" shall mean the conservation of energy through the
reduction of travel by employees of the office to and from their
designated workplace through the use of telecommunication and computer
technology in tasks including, but not limited to, information transfer
and processing.
14. "Critical energy infrastructure" means systems, including
industrial control systems, assets, places or things, whether physical
or virtual, so vital to the state that the disruption, incapacitation or
destruction of such systems, including industrial control systems,
assets, places or things could jeopardize the health, safety, welfare,
energy distribution, transmission, reliability, or security of the
state, its residents or its economy.
15. "Industrial control systems" means an information system used to
monitor and/or control industrial processes, including supervisory
control and data acquisition systems used to monitor and/or control
geographically dispersed assets, distributed control systems,
human-machine interfaces, and programmable logic controllers that
control localized processes.
§ 3-101 State energy policy
§ 3-101. State energy policy. It shall be the energy policy of the
state:
1. to obtain and maintain an adequate and continuous supply of safe,
dependable and economical energy for the people of the state, including
through the protection of critical energy infrastructure as defined in
subdivision fourteen of section 1-103 of this chapter, and to accelerate
development and use within the state of renewable energy sources, all in
order to promote the state's economic growth, to create employment
within the state, to protect its environmental values and agricultural
heritage, to husband its resources for future generations, and to
promote the health and welfare of its people;
2. to encourage conservation of energy and to promote the clean energy
and climate agenda, including but not limited to greenhouse gas
reduction, set forth within chapter one hundred six of the laws of two
thousand nineteen, also known as the New York state climate leadership
and community protection act, in the construction and operation of new
commercial, industrial, agricultural and residential buildings, and in
the rehabilitation of existing structures, through heating, cooling,
ventilation, lighting, insulation and design techniques and the use of
energy audits and life-cycle costing analysis;
3. to encourage the use of performance standards in all energy-using
appliances, and in industrial, agricultural and commercial applications
of energy-using apparatus and processes;
4. to encourage transportation modes and equipment which conserve the
use of energy;
5. to foster, encourage and promote the prudent development and wise
use of all indigenous state energy resources including, but not limited
to, on-shore oil and natural gas, off-shore oil and natural gas, natural
gas from Devonian shale formations, small head hydro, wood, solar, wind,
solid waste, energy from biomass, fuel cells and cogeneration; and
6. to encourage a new ethic among its citizens to conserve rather than
waste precious fuels; and to foster public and private initiative to
achieve these ends at the state and local levels.
* 7. to conduct energy planning in an integrated and comprehensive
manner through development of a long-range energy master plan which
shall provide the framework for energy related decisions made throughout
the state.
* NB Expired January 1, 1984
§ 3-103 Conformance with state energy policy
§ 3-103. Conformance with state energy policy. Every agency of the
state shall conduct its affairs so as to conform to the state energy
policy expressed in this chapter.
§ 5-108 Purchase of passenger automobiles
§ 5-108. Purchase of passenger automobiles. a. The commissioner, in
consultation with the commissioner of the office of general services,
shall promulgate rules and regulations which shall require, at a
minimum, that all passenger automobiles purchased by or for the state or
any agency or public authority thereof, of which a majority of the
members are appointed by the governor, in any fiscal year which
commences on or after April first, nineteen hundred eighty-one, achieve
an average fuel economy not less than the applicable average fuel
economy standard established pursuant to the provisions of this section
for the model year which includes January first of such fiscal year.
b. The commissioner, in consultation with the office of general
services, shall be further authorized to establish minimum fuel economy
standards for different classes of passenger automobiles, as
appropriate, which shall be applicable to such vehicles purchased by or
for the state or any agency or public authority thereof subject to the
requirements of subdivision a of this section.
c. As used in this section:
(1) The term "passenger automobile" means any four wheeled vehicle
propelled by fuel which is manufactured for use on public streets, roads
and highways, which is rated at six thousand pounds gross vehicle weight
or less, and which the commissioner determines by rule is manufactured
primarily for use in the transportation of not more than ten
individuals.
(2) The term "passenger automobile" shall not include police, fire, or
other emergency vehicles, as defined by the commissioner, or snow
removal, salt-spreader, and garbage disposal vehicles, or any vehicles
which the commissioner determines, by regulation, should be excluded
from being defined as "passenger vehicles".
(3) The term "average fuel economy" means the total number of
passenger automobiles acquired in a fiscal year to which this section
applies divided by a sum of terms, each term of which is a fraction
created by dividing (i) the number of passenger automobiles so acquired
of a given model type, by (ii) the rated fuel economy of such model type
as determined and published by the federal agency with jurisdiction over
the determination and publication of such fuel economy ratings during
that fiscal year.
(4) The term "average fuel economy standard" means the average miles
per gallon to be achieved in the operation of passenger automobiles
manufactured in a particular model year and shall be as follows:
Model year Fuel economy standard
(miles per gallon)
1981 ................................................... 22.0
1982 ................................................... 24.0
1983 ................................................... 26.0
1984 ................................................... 27.0
1985 ................................................... 27.5
1991 and thereafter .................................... 29.0
§ 5-108-A Energy efficient appliances
§ 5-108-a. Energy efficient appliances. 1. The president of the New
York state energy research and development authority, in consultation
with the commissioner of the office of general services, shall
promulgate minimum energy efficiency standards for appliances and energy
using products purchased by or for the state or any agency thereof in
accordance with the following schedule: by April first, two thousand
two, fluorescent lamp ballasts, central air conditioners, room air
conditioners, package terminal air conditioners and heat pumps; by
October first, two thousand two, electric motors, refrigerators,
freezers, refrigerator-freezers, water heaters, lamps and luminaries;
and by April first, two thousand three, dishwashers, clothes washers,
clothes dryers, furnaces, boilers and chillers. Additional minimum
energy efficiency standards for appliances and energy using products may
be added by the president of the New York state energy research and
development authority, in consultation with the commissioner of the
office of general services. Establishing minimum energy efficiency
standards for appliances and energy using products shall be based on
cost-effectiveness criteria and may be waived in the event that such
appliances or products are not widely available, or for other reasons as
determined by the president of the New York state energy research and
development authority, in consultation with the commissioner of the
office of general services. Such standards shall be designed to achieve
cost effective savings to the maximum extent practicable, taking into
account market availability.
2. New or replacement appliances or products purchased by or for the
state or any agency thereof shall meet or exceed standards promulgated
pursuant to this section, and all building designs or specifications for
new construction or substantial renovation for any building owned or
leased in whole by the state or any agency thereof shall incorporate
appliances or products which meet or exceed such standards.
§ 5-111 State energy conservation plan
§ 5-111. State energy conservation plan. The office shall formulate
and from time to time revise a state energy conservation plan to be
submitted pursuant to the federal Energy Policy and Conservation Act of
1975 or any acts amendatory or supplemental thereto.
§ 5-113 Coordination with environmental conservation law
§ 5-113. Coordination with environmental conservation law. The office
may review and comment in writing upon the statements of effects on the
use and conservation of energy resources made pursuant to section 8-0109
of the environmental conservation law. Such written comment shall be
made public.
§ 5-117 Powers during energy or fuel emergency
§ 5-117. Powers during energy or fuel emergency. 1. Upon a finding
and declaration by the governor that there exists or impends an energy
or fuel supply emergency, which declaration shall state the governor's
reasons for such finding, the commissioner shall be authorized, in
addition to the powers and duties set forth elsewhere in this chapter,
to the extent not in conflict with federal law, notwithstanding any
state or local law or contractual agreement, to:
(a) Allocate available supplies of energy or energy resources among
areas, users, persons or categories of persons or users. In allocating
available supplies, the commissioner shall give priority to energy and
energy resources use essential to public health and safety, and shall
thereafter attempt to allocate the remaining supply equitably and in a
manner designed to avoid undue hardship.
(b) Impose restrictions on any wasteful, inefficient, or non-essential
use of energy or energy resources, and upon the promotion of such uses.
(c) Waive state and local environmental protection requirements to the
extent necessary for emergency use of energy resources not meeting such
requirements for a period of not more than thirty days; provided,
however, that an additional thirty days may be granted for good cause.
Only one such waiver and one extention thereof may be granted any
facility within any six month period.
2. The powers granted to the commissioner pursuant to subdivision one
of this section shall be in addition to and not in limitation of any
emergency powers now vested in the governor which the governor may
choose to delegate to the commissioner.
3. In excerising the powers granted pursuant to subdivisions one and
two of this section, the commissioner may supersede any emergency power
heretofore vested in any other state agency.
4. No declaration of an energy or fuel supply emergency shall be
deemed effective for a period in excess of six months, and no power
exercised pursuant to this section shall be effective for a period in
excess of six months, unless each house of the legislature shall consent
to an extension for a specific period of time.
§ 5-119 Violations; sanctions
§ 5-119. Violations; sanctions. 1. Every person shall obey, observe
and comply with the provisions of this chapter and with every order,
rule or regulation issued or made pursuant to this chapter, so long as
the same shall be and remain in force. Any person who violates any
provision of this chapter or who fails, omits or neglects to obey,
observe or comply with any order, rule or regulation issued pursuant to
this chapter, either personally or through an agent or employee, shall
forfeit to the people of the state of New York a civil penalty not to
exceed one thousand dollars for each and every offense or three times
the profit received from each violation, whichever is greater, except to
the extent that a different civil penalty is specifically provided for
by another provision of this chapter. Every violation pursuant thereto,
shall be a separate and distinct offense, and, in the case of a
continuing violation, every day's continuance thereof shall be a
separate and distinct offense, except to the extent that another
provision of this chapter specifically provides otherwise.
2. At the request of the commissioner, the attorney general may bring
an action or special proceeding to recover a civil penalty provided for
by this chapter in any court of competent jurisdiction in this state, in
the name of the people of the state of New York, except where another
provision of this chapter specifically provides for a different means of
recovering such penalty. A penalty may be released or compromised, and
an action or proceeding to recover the same may be settled and
discontinued, by the attorney general with the consent of the
commissioner. In any action or proceeding pursuant to this section, all
penalties incurred up to the time of commencing the same may be sued for
and recovered therein, and the commencement of an action or proceeding
shall not be a waiver of the right to recover any other penalty. All
moneys recovered in any such action or proceeding, together with the
costs thereof, shall be paid into the state treasury to the credit of
the general fund.
3. Alternatively, or in addition to any action or special proceeding
to recover a civil penalty provided for by this chapter, the attorney
general, at the request of the commissioner, may bring an action or
special proceeding in any court of competent jurisdiction to enjoin the
violation of any provision of this chapter, or any order, rule or
regulation issued pursuant to this chapter, and to seek other
appropriate relief, including but not limited to abatement of the
violation and restitution; provided, however, that to the extent that
another provision of this chapter specifically provides for injunctive
or other appropriate relief, its terms shall apply to such action or
proceeding. Upon a proper showing, a temporary restraining order, a
preliminary injunction, a permanent injunction and other appropriate
relief shall be granted.
§ 5-121 Reserved power of the governor
§ 5-121. Reserved power of the governor. Nothing contained in this
chapter shall be construed to limit, curtail, abolish or terminate any
function or power of the governor which he had prior to the effective
date hereof.
§ 5-127 New York state business energy conservation loan program
§ 5-127. New York state business energy conservation loan program. 1.
As used in this section, unless a different meaning clearly appears from
the context, the term:
a. "Agri-business" shall mean (i) an individual, partnership or
corporation involved in farm production which (1) has had twenty
thousand dollars or more in gross farm production related sales in the
twelve-month period prior to the submission of a program application, or
from which at least fifty percent of the applicant's income was derived
during such period, or (2) if the applicant has not been in operation
for the prior twelve-month period, certifies that sales are projected in
excess of twenty thousand dollars, or at least fifty percent of the
applicant's income is projected to be derived, from farm production
during the next twelve-month period; or (ii) a business involved in food
processing.
b. "Financing institution" shall mean and include all banks, trust
companies, savings banks, savings and loan associations and credit
unions, whether incorporated, chartered, organized or licensed under the
laws of this state, any other state of the United States or the federal
government.
This term may also include public authorities, public benefit
corporations, units of local government, domestic insurance companies
and not-for-profit corporations, which make loans for improvements for
the benefit of eligible applicants.
c. "Eligible applicant" or "applicant" shall mean (i) a small to
medium size business or a not-for-profit corporation that is a veteran's
organization which employs less than five hundred workers or has gross
annual sales of less than ten million dollars, or (ii) an agri-business,
and which is the owner or which has a lease or management agreement
extending beyond the loan term of a building located within the state
for which an eligible energy conservation improvement is made, provided
that the commissioner may qualify this definition by rule and
regulation.
d. "Eligible energy conservation improvement" or "improvement" shall
mean the construction, alteration, repair or improvement to a building
or equipment affixed to, contained in or on the grounds of the building
which reduces energy consumption provided that: (i) the cost of such
improvement will be returned in savings in energy costs within a period
of not less than one year nor more than ten years as identified in an
energy audit, (ii) work on such improvement commenced after submittal of
an application under the program, and (iii) such construction,
alteration, repair or improvement is permissible under federal
requirements and court decisions applicable to overcharge funds
appropriated to this program.
e. "Energy audit" shall mean a process which identifies and specifies
the energy and cost savings which are likely to be realized by an
eligible energy conservation improvement.
f. "Loan" or "program loan" shall mean a loan from a financing
institution pursuant to an agreement with the office as part of the New
York state business energy conservation loan program.
g. "Program" shall mean the New York state business energy
conservation loan program.
h. "Region" shall mean one or more of the following named areas
comprised of the counties indicated:
(1) Buffalo-Rochester: Cattaraugus, Chautauqua, Erie, Genesee,
Livingston, Monroe, Niagara, Ontario, Orleans, Seneca, Wayne, Wyoming
and Yates counties;
(2) Syracuse-Southern Tier: Allegany, Broome, Cayuga, Chemung,
Chenango, Cortland, Delaware, Madison, Onondaga, Oswego, Otsego,
Schuyler, Steuben, Tioga and Tompkins counties;
(3) Central-Northern: Albany, Clinton, Essex, Franklin, Fulton,
Hamilton, Herkimer, Jefferson, Lewis, Montgomery, Oneida, Rensselaer,
Saratoga, Schenectady, Schoharie, St. Lawrence, Warren and Washington
counties;
(4) Westchester-Mid-Hudson: Columbia, Dutchess, Greene, Orange,
Putnam, Rockland, Sullivan, Ulster and Westchester counties;
(5) Long Island: Nassau and Suffolk counties;
(6) New York City: the five counties comprising the city of New York.
2. The commissioner is hereby authorized and directed to establish the
New York state business energy conservation loan program. The program
shall facilitate below market interest rate loans by financing
institutions within the state for eligible energy conservation
improvements made to eligible applicants as hereinafter provided.
3. The commissioner may enter into cooperative agreements with
financing institutions within the state for the financing with the
institution's own assets of eligible energy conservation improvements by
eligible applicants at a rate that is at least twenty-five percent below
the prime interest rate. Such interest rate shall initially be five
percent. The commissioner shall agree to utilize such funds as are
appropriated to this program and the earnings produced on such funds to
underwrite interest subsidies on loans made to eligible applicants, if
not inconsistent with federal requirements and court decisions directing
the payment of petroleum overcharge funds to the state. Such agreements
shall provide that: (i) the maximum loan per applicant shall be five
hundred thousand dollars, except that the commissioner may increase the
maximum loan amount up to one million dollars for specific types of
improvements by rule and regulation, (ii) the duration of the loan shall
not to exceed ten years, (iii) program loans shall be made only after an
application has been made to the office, the office has approved the
technical merits of the proposed improvement and the office has notified
the financing institution of its approval and the amount of interest
reduction upon the loan to be funded pursuant to such agreement, and
(iv) loan agreements with program applicants shall provide for a post
installation inspection, as deemed necessary by the office.
4. The commissioner shall apportion the moneys appropriated for this
program for the purpose of providing interest subsidies to applicants
within each of the six regions of the state identified in paragraph g of
subdivision one of this section based on the ratio, calculated by the
commissioner, which reflects:
a. the volume of refined petroleum products consumed within that
region during the period beginning September first, nineteen hundred
seventy-three, and ending January twenty-eighth, nineteen hundred
eighty-one, compared to
b. the volume of refined petroleum products consumed within the six
regions during such period.
Such calculation shall be made by the commissioner upon estimates
determined by him in reliance upon reasonably available information.
The commissioner may reapportion the funds available for interest
subsidies for applicants within any region under this subdivision for
use in one or more of the other regions upon finding that participation
in the program within the former region would not be adversely affected,
and that there exists in the latter region or regions inadequate funds
to satisfy the demand for program participation. In any fiscal year of
the state, the amount of funds available to applicants within any region
may be reduced by not more than twenty-five percent of the total amount
apportioned for such region. A copy of the commissioner's finding shall
be given to the chairman of the senate finance committee and the
chairman of the assembly ways and means committee.
5. In addition to the authority granted under subdivision three of
this section, the commissioner shall be authorized to utilize monies
appropriated to this program for the purpose of providing loan
guaranties and principal reductions for eligible applicants, if such
uses are permissible under the conditions applicable to the appropriated
overcharge funds. Principal reductions shall be limited to the amount of
the interest subsidy which would otherwise be available to an eligible
applicant under subdivision three of this section.
6. In implementing the program, the commissioner is authorized to take
such action as he deems necessary and appropriate which may include but
not be limited to the promulgation of rules and regulations formulated
after consultation with the energy research and development authority,
the department of commerce and the department of financial services.
Such rules and regulations may include but not be limited to
requirements for applications and supporting materials and criteria for
the selection of cooperating financing institutions.
§ 6-102 State energy planning board
§ 6-102. State energy planning board. 1. There shall be established a
state energy planning board, hereinafter referred to as the "board",
which shall consist of the chair of the public service commission, the
commissioner of environmental conservation, the chief executive officer
of the New York power authority, the commissioner of economic
development, the commissioner of transportation, the commissioner of
labor, the commissioner of the division of homeland security and
emergency services, the commissioner of agriculture and markets, the
commissioner of health, the secretary of state and the president of the
New York state energy research and development authority. The governor,
the speaker of the assembly and the temporary president of the senate
shall each appoint one additional representative to serve on the board;
in addition, the secretary of state shall appoint, from the utility
intervention unit with the consumer protection division established in
section ninety-four-a of the executive law, an additional person to
serve on the board. The presiding officer of the federally designated
electric bulk system operator (BSO) shall serve as a non-voting member
of the board. Any decision or action by the board shall be by majority
vote. The president of the New York state energy research and
development authority shall serve as chair of the board. Members of the
board may designate an executive staff representative to participate on
the board on their behalf.
2. Regional planning councils shall be established. Two regions shall
be established as follows:
(a) Downstate region - New York City and Dutchess, Nassau, Orange,
Putnam, Rockland, Suffolk, Ulster and Westchester counties;
(b) Upstate region - Albany, Allegany, Broome, Cattaraugus, Cayuga,
Chautauqua, Chemung, Chenango, Clinton, Columbia, Cortland, Delaware,
Erie, Essex, Franklin, Fulton, Genesee, Greene, Hamilton, Herkimer,
Jefferson, Lewis, Livingston, Madison, Monroe, Montgomery, Niagara,
Oneida, Onondaga, Ontario, Orleans, Oswego, Otsego, Rensselaer,
Saratoga, Schenectady, Schoharie, Schuyler, Seneca, St. Lawrence,
Steuben, Sullivan, Tioga, Tompkins, Warren, Washington, Wayne, Wyoming
and Yates counties.
The governor, temporary president of the senate and the speaker of the
assembly shall each appoint three regional planning council members per
region. Regional planning council members shall serve without
compensation, and shall have their principal residence within the region
for which they are appointed. Such regional council members may solicit
input from stakeholder interests within their region, including but not
limited to local governments, municipal utilities, rural electric
cooperatives, utilities, labor unions, ratepayers, businesses, trade
associations, generators, and community organizations. Each regional
planning council shall transmit to the board a report containing any
recommendations specific to its region on a schedule determined by the
board to be appropriate for consideration of such report in the
development of the draft energy plan.
3. Staff services shall be performed by personnel of the department of
public service, the department of environmental conservation, the New
York power authority, the department of transportation, the department
of economic development, the division of homeland security and emergency
services and the New York state energy research and development
authority, as directed by the board. Assistance shall also be made
available, as requested by the board, from other agencies, departments
and public authorities of the state. The board may provide for its own
representation in all actions or proceedings in which it is a party.
4. The board shall have the powers: (a) to adopt a state energy plan
in accordance with the provisions of this article;
(b) to adopt rules and regulations as necessary or appropriate to
implement this article;
(c) to issue subpoenas and subpoenas duces tecum; and
(d) to authorize any person to conduct hearings which the board is
authorized to conduct, to take testimony with respect to the subject or
matter under investigation, and to report the testimony to the board. In
the conduct of such hearings, any person so authorized by the board
shall have all the powers of the board.
5. The board shall in the consideration and development of policies,
programs, and other actions, be guided by the goals of: improving the
reliability of the state's energy systems; insulating consumers from
volatility in market prices; reducing the overall cost of energy in the
state; and minimizing public health and environmental impacts, in
particular, environmental impacts related to climate change. Each energy
plan shall also identify policies and programs designed to maximize
cost-effective energy efficiency and conservation activities to meet
projected demand growth.
(a) The board shall identify the most appropriate state agency or
authority with the responsibility for implementing or overseeing such
prioritized policies and programs.
(b) Each agency or authority charged with implementing a specific
policy or program in the energy plan shall report to the board annually
regarding the original goal of such policy or program, steps that have
been taken to implement such policy or program, progress in attaining
goals, adjustments to the program or goals and reasons why adjustments
are needed, and anticipated date of completion.
(c) The board shall use such progress reports in the completion of
each subsequent energy plan and in each of the required biennial reports
as stated in section 6-106 of this article.
6. The board shall require any contractor or subcontractor awarded a
contract pursuant to the provisions of this article to comply, and
otherwise exercise all of its responsibilities and conduct all of its
activities consistent with the provisions of article fifteen-A of the
executive law with regards to the utilization and participation of
certified minority and women-owned business enterprises.
§ 6-104 State energy plan
§ 6-104. State energy plan. 1. The board shall adopt a state energy
plan in accordance with the provisions of this article.
2. The state energy plan shall include: (a) forecasts for a minimum
period of ten years, and for such other periods as the board may
determine, of: (i) demand for electricity, natural gas, coal, petroleum
products, including heating and transportation fuels, and alternate
fuels, including ethanol and other biofuels, to the extent possible,
taking into account energy conservation, load management and other
demand-reducing measures which can be achieved in a cost-effective
manner, including the basis for such projection, including an
examination of possible alternate levels of demand and discussion of the
forecasting methodologies and input variables used in making the
forecasts;
(ii) energy supply requirements needed to satisfy demand for
electricity, natural gas, coal, petroleum products, including heating
and transportation fuels, and alternate energy sources and fuels, for
each region of the state, and for the state as a whole, including with
respect to electricity, the amount of capacity needed to provide
adequate reserve margins and capacity needed to ensure reliability and
competitive markets in the various regions of the state;
(iii) an assessment of the ability of the existing energy supply
sources and the existing transmission or fuel transportation systems, to
satisfy, together with those sources or systems reasonably certain to be
available, such energy supply requirements, indicating planned
additions, retirements, deratings, substantial planned outages, and any
other expected changes in levels of generating and production capacity;
(iv) additional electric capacity and/or transmission or fuel
transportation systems needed to meet such energy supply requirements
that will not be met by existing sources of supply and those reasonably
certain to be available, where such analysis should identify system
constraints and possible alternatives available, both supply-side and
demand-side alternatives, including but not limited to distributed
generation, energy efficiency and conservation measures, to redress such
constraint; and
(v) projected greenhouse emissions.
(b) Identification and assessment of the costs, risks, benefits,
uncertainties and market potential of energy supply source alternatives,
including demand-reducing measures, renewable energy resources of
electric generation, distributed generation technologies, cogeneration
technologies, biofuels and other methods and technologies reasonably
available for satisfying energy supply requirements which are not
reasonably certain to be met by the energy supply sources identified in
paragraph (a) of this subdivision, provided that such analysis shall
include the factors identified in paragraph (d) of this subdivision;
(c) Identification and analysis of emerging trends related to energy
supply, price and demand, including trends related to the transportation
sector;
(d) An assessment of current energy policies and programs, and their
contributions to achieving long-range energy planning objectives
including, but not limited to, the least cost integration of energy
supply sources, energy transportation and distribution system and
demand-reducing measures for satisfying energy supply requirements,
giving due regard to such factors as required capital investments, cost,
ratepayer impacts, security and diversity of fuel supplies and
generating modes, protection of public health and safety, adverse and
beneficial environmental impacts, conservation of energy and energy
resources, the ability of the state to compete economically, and any
other policy objectives deemed appropriate;
(e) In order to assist the board in such evaluation, the power
authority of the state of New York and the Long Island power authority
shall individually submit to the planning board: (i) a strategic plan
specifying the mission and goals of the authority, the policies and
programs utilized to fulfill such mission and goals, and an explanation
of how such policies and programs relate to the state energy plan, (ii)
an annual five-year operating plan, and (iii) a ten-year projected
capital budget for their respective operations. Such plans shall include
major new capital and programmatic initiatives, as well as descriptions
and achievements of existing programs, including program objectives and
the numbers of clients and/or customers served for each service or
program;
(f) An analysis of security issues, considering both natural and human
threats to the state's energy systems;
(g) An environmental justice analysis;
(h) An assessment of the ability of urban planning alternative,
including but not limited to smart growth and mass transportation
improvements to reduce energy and transportation fuel demand;
(i) An inventory of greenhouse gas emissions, and strategies for
facilitating and accelerating the use of low carbon energy sources
and/or carbon mitigation measures;
(j) Recommendations, as appropriate and desirable, for administrative
and legislative actions to implement such policies, objectives and
strategies;
(k) Assessment of the impacts of implementation of the plan upon
economic development, health, safety and welfare, environmental quality,
and energy costs for consumers, specifically low-income consumers; and
(l) Such additional information as the board deems appropriate, such
as but not limited to, information developed from consultation with the
BSO.
3. The elements of the state energy plan as enumerated in subdivision
two of this section shall be provided on a statewide basis, and as
determined feasible and necessary by the board, for the two regions
described in subdivision two of section 6-102 of this article.
4. In the development of the state energy plan the board shall, to the
extent practicable, take cognizance of any comprehensive reliability
planning process undertaken by the BSO.
5. (a) The state energy plan shall provide guidance for energy-related
decisions to be made by the public and private sectors within the state.
(b) Any energy-related action or decision of a state agency, board,
commission or authority shall be reasonably consistent with the
forecasts and the policies and long-range energy planning objectives and
strategies contained in the plan, including its most recent update;
provided, however, that any such action or decision which is not
reasonably consistent with the plan shall be deemed in compliance with
this section, provided that such action or decision includes a finding
that the relevant provisions of the plan are no longer reasonable or
probable based on a material and substantial change in fact or
circumstance, and a statement explaining the basis for this finding.
(c) Nothing in this section shall limit the authority of any state
agency, board, commission or authority to deny an application to
construct, operate or modify an energy facility on environmental or
public health and safety grounds, or that alternate means of energy
procurement or alternate location for an energy facility can be secured.
(d) A state agency, board, commission or authority may take official
notice of the most recent final state energy plan adopted by the board
prior to any final energy-related decision by such agency, board,
commission or authority.
§ 6-106 Conduct of the state energy planning proceeding
§ 6-106. Conduct of the state energy planning proceeding. 1. Every
four years, the board shall adopt a state energy plan, which addresses
each item identified in subdivision two of section 6-104 of this article
provided, however, the board may adopt such a plan more frequently for
good cause shown. The board shall prepare biennial reports, every second
year following the issuance of the final state energy plan, including a
discussion and evaluation of the ability of the state and private
markets to implement the policies, programs, and other recommendations
as found in the state energy plan, and recommendations for new or
amended policies as needed to continue successful movement towards
implementation and realization of such policies and programs.
2. The board shall conduct a state energy planning proceeding,
consistent with the need to develop the plan in a timely manner, which
shall provide for the following at a minimum:
(a) The filing of information by energy suppliers as specified in
subdivision three of this section;
(b) The preparation and issuance of a draft plan, subsequent to the
filing of information as specified in subdivision three of this section,
which shall address each item identified in subdivision two of section
6-104 of this article;
(c) Public comment hearings, with at least three in each region
described in subdivision two of section 6-102 of this article and
provide an opportunity to submit written comments, subsequent to the
issuance of a draft plan, to obtain views and comments of interested
persons on any aspect of, or issue addressed in, such draft plan;
(d) Evidentiary hearings may be held, at the discretion of the board,
in response to a written request by an interested person or persons
seeking to provide evidentiary material or data subsequent to the
issuance of a draft plan, on issues identified in subdivision two of
section 6-104 of this article; and
(e) Submission of a notice for any hearing or opportunity for comment
provided for pursuant to this subdivision for publication within the
state register.
3. As determined by the board in each instance to be appropriate with
respect to the particular entity or entities from which information, if
any, shall be required, the information to be provided to the board by
energy transmission and distribution companies, electric, gas, or steam
corporations, major energy suppliers including owners or operators of
electric generation facilities, commodity and/or end-use energy service
providers, state agencies or authorities, including the power authority
of the state of New York and the Long Island power authority, and/or
others, shall include the following:
(a) Comprehensive long-range plans for future operations:
(i) a forecast of electricity demands over a period as the board may
determine appropriate, including annual in-state electric energy sales
and summer and winter peak loads by utility service area where
applicable, and total any annual in-state electric energy sales and
coincident peak load, specifically identifying the extent to which
energy conservation, load management and other demand-reducing measures,
and electric energy generated by cogeneration, small hydro and alternate
energy production facilities, including renewable energy technologies
and fuel cells, consumed on site, have been incorporated within such
forecast;
(ii) a forecast of electricity supply requirements over a period as
the board may determine appropriate, by utility service area where
applicable, specifically identifying the reserve margins required for
reliable electric service, the transmission and distribution losses
assumed, and the amount of out-of-state sales commitments;
(iii) an assessment of the ability of existing electricity supply
sources, and those reasonably certain to be available, to satisfy
electricity supply requirements, including electric generating
facilities which can be retained in service beyond their original design
life through routine maintenance and repairs;
(iv) an inventory of: (A) all existing electric generating and
transmission facilities including those owned or operated by the power
authority of the state of New York and the Long Island power authority;
(B) electric generating and transmission facilities planned or under
construction including the power authority of the state of New York and
the Long Island power authority, including the dates for completion and
operation; (C) the anticipated retirement dates for any electric
generating facilities currently operated including those owned or
operated by the power authority of the state of New York and the Long
Island power authority; (D) land owned or leased including that owned or
leased by the power authority of the state of New York and the Long
Island power authority and held for future use as sites for major
electric generating facilities; and (E) electric generating,
transmission, and related facilities operated, or planned to be
operated, by others, to the extent information concerning the same is
known;
(v) recommended supply additions and demand reducing measures for
satisfying the electricity supply requirements, not reasonably certain
to be met by electricity supply sources identified in subparagraph (iii)
of this paragraph, including the life extension of existing electric
generating facilities, and reasons therefor;
(vi) a statement of research and development plans, including
objectives and programs in the areas of energy conservation, load
management, electric generation and transmission, new energy
technologies and pollution abatement and control, which are not funded
through regulatory required programs, recent results of such programs
undertaken or funded to date, and an assessment of the potential impacts
of such results;
(vii) a projection of estimated electricity prices to consumers over
the forecast period, and a sensitivity analysis of that forecast
relating to a number of factors including fuel prices and the levels of
available capacity and demand in the regions of the state;
(viii) a description of the load forecasting methodology and the
assumptions and data used in the preparation of the forecasts,
specifically including projections of demographic and economic activity
and such other factors, statewide and by service area, which may
influence electricity demand, and the bases for such projections;
(ix) proposed policies, objectives and strategies for meeting the
state's future electricity needs; and
(x) such additional information as the board may, by regulation,
require to carry out the purposes of this article.
(b) All providers of natural gas transmission, distribution and/or
marketing services to customers shall individually prepare and submit a
comprehensive long-range plan for future operations, which shall
include, as appropriate:
(i) a forecast over a period as the board may determine appropriate,
by utility service area, of estimated annual in-state gas sales, winter
season sales and peak day sales by appropriate end-use classifications,
specifically identifying the extent to which energy conservation
measures and the sale of gas owned by persons other than natural gas
transmission and distribution utilities have been incorporated within
such forecast;
(ii) a forecast of gas supply requirements over a period as the board
may determine appropriate, by utility service area, specifically
identifying the amounts of gas needed to meet severe weather conditions,
lost and unaccounted for gas, out-of-state sales commitments and
internal use;
(iii) an assessment of the ability of existing gas supply sources, and
those reasonably certain to be available, to satisfy gas supply
requirements;
(iv) an inventory of: (A) all existing supply sources, storage
facilities, and transmission facilities which are used in providing
service within the state, (B) the transmission and storage facilities
under construction which would be used in providing service within the
state, their projected costs and capacities, including peaking capacity,
(C) transmission facility additions proposed to be constructed by
natural gas transmission and distribution utilities, (D) transmission
facilities operated, or planned to be operated, by others, to the extent
information concerning the same is known;
(v) recommended supply additions and demand-reducing measures for
satisfying the gas supply requirements, not reasonably certain to be met
by gas supply sources identified in subparagraph (iii) of this paragraph
and the reasons therefor;
(vi) a projection of estimated gas prices to consumers over the
forecast period, and a sensitivity analysis of that forecast relating to
a number of factors including the levels of commodity supply
availability, of available pipeline and storage capacity, and of demand
in the regions of the state;
(vii) a description of the load forecasting methodology and the
assumptions and data used in the preparation of the forecasts,
specifically including projections of demographic and economic activity
and such other factors, statewide and by service area where applicable,
which may influence demand for natural gas, and the bases for such
projections;
(viii) a statement of research and development plans, including
objectives and programs in the areas of energy conservation and new
energy technologies, recent results of such programs undertaken or
funded to date, and an assessment of the potential impacts of such
results;
(ix) proposed policies, objectives and strategies for meeting the
state's future gas needs; and
(x) such additional information as the board may, by regulation,
require to carry out the purposes of this article.
(c) Such information from major petroleum suppliers and major coal
suppliers as the board may require to carry out the purposes of this
article.
(d) Such other information from owners and operators of electric
generating power plants as the board may require to carry out the
purposes of this article.
(e) A single comprehensive submission from industry groups, trade
associations, or combinations of such groups and associations in place
of submissions by individual member companies.
4. Any information filed under this section that is claimed to be
confidential shall be treated in accordance with regulations adopted by
the board pertaining to the determination of confidential status and the
retention of confidential records.
5. Copies of the draft plan, and all non-confidential information and
comments filed pursuant to this section shall be made available to the
public for inspection.
6. The board may amend the state energy plan, or aspects thereof, upon
its own initiative or upon the written application of any interested
person. In connection with any such amendment, the board may require the
filing of such information as may be required, consistent with
regulation. Prior to adopting any proposed amendment to an element of
the plan identified in subdivision two of section 6-104 of this article,
the board shall hold public comment hearings and may hold evidentiary
hearings upon the written application of an interested party. Prior to
adopting a proposed amendment to any element of the plan, the board
shall prepare and publish in the state register notice of any draft
amendment and reasons therefor and shall solicit public comments
thereon. The board shall adopt an amendment to the state energy plan, or
aspects thereof, upon a finding by the board that there has been a
material and substantial change in fact or circumstance since the most
recent plan was adopted. A decision of the board that no amendment is
necessary, together with the reasons supporting such determination,
shall be final.
* 7. Any person who participated in the state energy planning
proceeding or any person who sought an amendment of the state energy
plan pursuant to subdivision six of this section, may obtain, pursuant
to article seventy-eight of the civil practice law and rules, judicial
review of the board's decision adopting a plan, or any amendment
thereto, or of the board's decision not to amend such plan pursuant to
subdivision six of this section. Any such special proceeding shall be
brought in the appellate division of the supreme court of the state of
New York for the third judicial department. Such proceeding shall be
initiated by the filing of a petition in such court within thirty days
after the issuance of a decision by the board. The proceeding shall have
a lawful preference over any other matter, shall be heard on an
expedited basis and shall be completed in all respects, including any
subsequent appeal, within one hundred eighty days of the filing of the
petition. Where more than one such petition is filed, the court may
provide for consolidation of the proceedings. Notwithstanding the
provisions of articles seven and eight of the public service law, the
procedure set forth in this section shall constitute the exclusive means
for seeking judicial review of any element of the plan.
* NB Effective until December 31, 2040
* 7. Any person who participated in the state energy planning
proceeding or any person who sought an amendment of the state energy
plan pursuant to subdivision six of this section, may obtain, pursuant
to article seventy-eight of the civil practice law and rules, judicial
review of the board's decision adopting a plan, or any amendment
thereto, or of the board's decision not to amend such plan pursuant to
subdivision six of this section. Any such special proceeding shall be
brought in the appellate division of the supreme court of the state of
New York for the third judicial department. Such proceeding shall be
initiated by the filing of a petition in such court within thirty days
after the issuance of a decision by the board. The proceeding shall have
a lawful preference over any other matter, shall be heard on an
expedited basis and shall be completed in all respects, including any
subsequent appeal, within one hundred eighty days of the filing of the
petition. Where more than one such petition is filed, the court may
provide for consolidation of the proceedings. Notwithstanding the
provisions of article seven of the public service law, the procedure set
forth in this section shall constitute the exclusive means for seeking
judicial review of any element of the plan.
* NB Effective December 31, 2040
8. Proceedings conducted pursuant to this section shall not be
considered part of an adjudicatory proceeding as defined in subdivision
three of section one hundred two of the state administrative procedure
act, or part of a rule making proceeding held under subdivision one of
section two hundred two of the state administrative procedure act.
§ 6-108 Supplemental studies for future energy planning
§ 6-108. Supplemental studies for future energy planning. The board
shall undertake the following studies to supplement information for
future energy planning:
1. On or before September first, two thousand twelve, and every four
years thereafter, the board shall undertake a study of the overall
reliability of the state's electric transmission and distribution
system. The board may contract with an independent and competitively
selected contractor to undertake such study. The board shall prepare a
report on such study's findings and legislative recommendations. The
board shall transmit such report along with the reliability study to the
governor, the speaker of the assembly, the temporary president of the
senate, the chair of the assembly energy committee, and the chair of the
senate energy and telecommunications committee.
2. Such study shall include, at a minimum, an assessment of each of
the following:
(a) the current and projected reliability of the electric power system
over the term of the planning period, with specific focus on
transmission systems and distribution systems within the state. The
assessment shall examine: (i) investment in infrastructure, including
capital improvements, expansions, and maintenance; and (ii) workforce
utilization.
(b) the potential impact of the following on distribution system
reliability and on each factor enumerated in paragraph (a) of this
subdivision: (i) distributed electric generation, especially generation
using renewable or innovative energy resources; (ii) energy conservation
and efficiency; (iii) load control and peak saving measures; (iv)
corporate reorganization of electric utilities; (v) performance
ratemaking, multi-year rate agreements, and other departures from
traditional regulatory mechanisms; and (vi) large scale industrial
development.
(c) the potential impact of the following on transmission system
reliability: (i) each factor enumerated in paragraph (b) of this
subdivision; (ii) changes in protocols for electricity dispatched
through the BSO or its successor or successors; (iii) accommodation of
proposed new electric generation facilities or repowering or life
extension of existing facilities; and (iv) the market-driven nature of
decisions to build, size, and locate such facilities.
3. The board and any contractors it may retain for such purposes shall
consult with entities that have resources and expertise to assist in
such study, including, but not limited to, the BSO, public utilities,
and any other electric company or trade organizations.
(a) The Long Island power authority, the power authority of the state
of New York, the department of public service, and the BSO shall
cooperate with the board and its contractor.
(b) The Long Island power authority and the power authority of the
state of New York are authorized, as deemed feasible and advisable by
their respective boards, to make a voluntary contribution toward the
study.
§ 7-101 Transfer of functions of the atomic energy council
§ 7-101. Transfer of functions of the atomic energy council. All the
functions and powers possessed by and all the obligations and duties of
the atomic energy council, created and established in the commerce law
pursuant to and by chapter nine hundred forty-seven of the laws of
nineteen hundred sixty-eight, which council is hereby abolished, are
hereby transferred and assigned to, assumed by and devolved upon the
state energy office.
§ 7-103 Transitional provisions
§ 7-103. Transitional provisions. 1. Upon the transfer of functions
pursuant to this article within the state fiscal year within which this
act shall take effect, provision shall be made for the transfer to the
state energy office of employees of all directly affected state agencies
whom the commissioner determines to be required by the office, subject
to the approval of the director of budget. Employees so transferred
shall be transferred without further examination or qualification and
shall retain their respective civil service classifications and status
until or unless reclassified or reallocated. For the purpose of
determining the employees holding permanent appointments in competitive
class positions to be transferred, such employees shall be selected in
each class of positions in the order of their original appointment, with
due regard to the right of preference in retention of disabled and
nondisabled veterans. Any such employee who, at the time of such
transfer, has a temporary or provisional appointment shall be
transferred subject to the same right of removal, examination or
termination as though such transfer had not been made. Employees holding
permanent appointments in competitive class positions who are not
transferred pursuant to this section shall have their names entered upon
an appropriate preferred list for reinstatement pursuant to the civil
service law.
2. The directors and officers of state agencies, the functions,
powers, duties and obligations of which are transferred by this chapter
shall deliver to the state energy office all books, papers, records and
property of such agencies, and of the directors and officers thereof
pertaining to the functions herein transferred.
3. For the purpose of succession to all functions, powers, duties and
obligations of state agencies, or directors and officers thereof,
transferred and assigned to, devolved upon and assumed by the state
energy office, such office shall be deemed and held to constitute the
continuation of such agencies and not a different agency or authority.
4. Any business or other matter undertaken or commenced by any agency
or the officers and directors thereof, pertaining to or connected with
the functions, powers, obligations and duties hereby transferred and
assigned, and pending on the effective date of this chapter, may be
conducted and completed by the state energy office in the same manner
and under the same terms and conditions and with the same effect as if
conducted and completed by such agencies, directors and officers
thereof.
5. All rules, regulations, acts, determinations and decisions o
The text continues in the official source.
